What are the three-level undertaking scope of general contracting of electric power engineering construction?

2020-12-25 00:00:00
second

Before understanding the scope of three-level undertaking of general contracting of electric power engineering, let's take a look at the enterprise standard of three-level undertaking of general contracting of electric power engineering construction.

Three level standard for general contracting of electric power engineering construction:

1. We need enterprise assets. Here, enterprise assets refer to net assets. The net assets of an enterprise need to be more than 8 million yuan.

2. The main personnel of an enterprise shall include the following personnel:

(1) There are no less than 5 registered constructors of mechanical and electrical engineering.

(2) The technical director has more than 5 years of experience in engineering construction technology management, and has the professional title of intermediate or above in power engineering or registered constructor qualification in mechanical and electrical engineering; there are no less than 10 personnel with professional title of intermediate or above in power engineering.

(3) There are no less than 15 construction site management personnel with post certificates, and the construction personnel, quality personnel, safety personnel, data personnel and other personnel are complete.

(4) There are no less than 30 technical workers above intermediate level who have passed the examination or training.

(5) The technical director (or registered constructor) has presided over and completed at least 2 projects of this category.

Introduction to three-level undertaking scope of general contracting of electric power engineering construction:

The third level of general contracting for electric power engineering construction can undertake the construction of power generation projects with single unit capacity of 100000 kW or less, transmission lines of 110kV or less and substations with the same voltage level.