Municipal Engineering Construction and urban residents are inextricably linked, because the project is usually located in the central urban area of the city, the project construction will have a lot of adverse effects on the people and the surrounding environment of the project, in order to avoid the impact on the masses and reduce the damage to the surrounding environment, we must do a good job of on-site organization and management.
Because most of the municipal projects are built in the main urban area, they are built around the people. Therefore, the construction site specification has become an important part of project quality supervision. In order to effectively handle the relationship between construction and public travel, public life, as far as possible to ensure the safety of society, channel, all kinds of pipelines, the surrounding environment dust, noise reduction, the convenience left to the people. It has become one of the important organizational work of municipal engineering to do a good job in the field organization and management of municipal engineering. Effective on-site management can not only find and deal with the irregularities in time, but also eliminate many irregularities in the bud.
Characteristics and problems of municipal engineering construction site management
1. Features:
1) The construction period is tight and the task is heavy; 2) the site is narrow and the distribution of the original facilities on the ground and underground is complex; 3) there are many construction contents and various processes interact with each other; 4) there are many participating units and the workload of mutual coordination is large; 5) there are many external interferences and the workload of external coordination management is large; 6) there are many potential safety hazards and high requirements for safety management; 7) there are high requirements for civilized construction and environmental protection .
2. Problems
1) It is difficult to achieve comprehensive and effective control of human factors; 2) it is difficult to achieve comprehensive control of material factors; 3) it is difficult to conduct comprehensive inspection in the process of quality control and there are potential quality and safety hazards; 4) the safety awareness is not high and the responsibility is not clear; 5) the awareness of civilized construction and environmental protection is weak.