Liaoning Huixin Construction Co., Ltd approved by the State Administration, it was officially established on December 18th, 2019. The company covers metallurgy engineering, construction engineering, municipal public works, mining engineering, highway engineering, railway engineering, water conservancy and hydropower project, formwork engineering, scaffold project, furnace project, white steel metal structure project, foundation engineering, earthwork engineering, ready mixed concrete project, electric power Sub and intelligent engineering, fire protection facilities engineering, waterproof, anti-corrosion and moisturizing engineering, bridge engineering, ancient building engineering, building curtain wall engineering, environmental protection engineering, lightning protection project, hydraulic metal structure installation, special engineering, river engineering, water and soil conservation project, apprentice arrangement project, construction demolition project, pipeline engineering, petrochemical engineering, building Electromechanical, lifting equipment maintenance Construction labor services; automobile transportation; leasing of automobiles, templates and scaffolds; sales of steel, hardware, pump, metal hose, metallurgical equipment, lifting equipment, mining equipment, petrochemical equipment, building materials, decoration materials, office supplies, living supplies, sports goods, furniture, electric cables, electric equipment, fire-fighting equipment and fire-fighting equipment.

With a registered capital of 109.88 million yuan, the company adheres to the concept of "people-oriented, technological innovation" and cultivates a large number of excellent engineering management talents and professional construction technicians, making an indelible contribution to the national urban construction. At the beginning of the company was established by a large number of enterprises and institutions of concern and praise.

On September 10, 2020, our company and Chaoyang iron and Steel Co., Ltd. of Angang Group signed the construction contract of temporary reinforcement of No. 1 caster platform of Chaoyang iron and steel steelmaking plant, with a total contract amount of 223740 yuan (tax included).

On September 20, 2020, our company and Chaoyang iron and Steel Co., Ltd. of Angang Group signed the construction contract of "cold proof maintenance of hot rolling plant", with a total contract amount of 157974 yuan (tax included).

On October 10, 2020, our company signed the construction contract of "annual repair of civil engineering foundation of Chaoyang iron and steel hot rolling plant" with Angang Chaoyang iron and Steel Co., Ltd., with a total contract amount of 53955 yuan (tax included).

On October 15, 2020, our company signed a construction contract with Chaoyang Branch of Angang scrap resources (Anshan) Co., Ltd. for equipment foundation, plant floor hard cover, green fence, hazardous waste room and other works of Angang Chaoyang 500000 tons scrap processing project, with a total contract amount of 6670642.2 yuan (excluding tax).

On November 23, 2020, our company signed the construction contract of "foundation and floor renovation of oxygen storage tank area" with Anshan Iron and Steel Co., Ltd., with a total contract amount of 337900 yuan (tax included).

On January 6, 2021, our company signed the construction contract of Ningxia iron and Steel Group sintering project electrical engineering with Anshan Iron and Steel Group Engineering Technology Co., Ltd., with a total contract amount of 9395744 yuan (tax included).

On January 8, 2012, our company and Anshan Iron and Steel Group refractory Co., Ltd. signed the maintenance contract of "manufacture and installation of safety railings of screw unloader in lime operation area", with the contract amount of 113000 yuan (excluding tax).

In the above construction process, our company strictly controls the construction quality, the site construction management is rigorous and orderly, the civilized construction work is implemented in place, and the construction task is completed with quality and quantity under the condition of ensuring that the normal production work of the enterprise is not affected. At the beginning of its establishment, the company has reached cooperation with Chaoyang steel plant, Bayuquan steel plant, Anshan Steel Co., Ltd., Anshan Steel Design Institute, Anshan Steel Group refractory plant and other units. On the premise of successfully completing the project, the company adheres to the new idea of innovation and advancement in the management process, greatly shortens the construction period and creates huge profits for the enterprise.

It is believed that in the future, Liaoning Huixin Construction Co., Ltd. will uphold the enterprise service concept of taking integrity as the foundation, taking dedication as the responsibility and harmony as the core, so as to make architecture a classic and make classics an eternal purpose, and guide the enterprise in the future.


Liaoning Huixin Construction Co., Ltd

Home  |  About  |  Product   |  Cases  |  Honor  |  Video  |  News  |  Job | Contact