Electric Power Engineering Construction
Management system of Electric Power Survey and Design Institute
1. Management system of Design Institute
In terms of administrative division of labor, the planning department is responsible for production task arrangement and balance, and the technology department is responsible for quality improvement and progress. The production department is responsible for engineering design, the technology and economic department is responsible for investment control (including quota design), and the quality management of each department is guided and supervised by the total quality management office.
2. Management system of detailed engineering
The chief design engineer is fully responsible for the project, and his primary responsibility is to act as the external liaison, to work with the relevant departments to submit the primary plan, and to coordinate the various disciplines. Ensure the successful completion of the construction period. The chief engineer of each specialty (including the professional engineer of the technical department) shall be responsible for the quality control of the specialty. To assist the designer to draw up the design plan and formulate the professional quality management method. A chief designer shall be set up for each specialty. In addition to acting as the external harmonious liaison, the design division shall be carried out within the specialty with the cooperation of section chief and chief engineer to ensure that the formulated design plan is conscientiously implemented and tasks are completed on time. The chief engineer should first ensure the quality of engineering products, and check whether the major plans are in line with the party's guidelines, reasonable, economic and reliable. Generally speaking, the design of a detailed project should pass the preliminary feasibility study. Feasibility study. There are four stages of preliminary design and construction drawing design.