It is understood that after the installation of a power project entity, it is necessary to clean the site and carefully check and prepare before entering the commissioning steps. The commissioning can timely find problems and solve problems. Only after commissioning can the project be completed smoothly. So, what are the commissioning criteria for power installation? Let's listen to the detailed introduction brought by the power engineering construction company:
1. Safety should be the criterion
At any time, safety is the primary criterion of power installation. The normal power installation company should not only ensure the smooth completion of the project, but also ensure the safety of the construction personnel, including the safety of the personnel and equipment. The construction shall be stable and stable. All operations shall be carried out through strict operation process. The equipment commissioning stage must be completed under the joint witness of both the construction party and the trustee.
2. The five first five and then the later criteria should be followed
The commissioning of power installation project can also be understood as power on trial operation. Since it is powered on, it is dangerous to carry out strictly according to the principle of five first five and then then, namely, single machine and joint commissioning, manual first, then automatic, local and remote, no load first, first jogging and linkage. After the completion of the project, all mechanical equipment is still in the running in and commissioning stage, which requires a period of running in to operate normally.
3. Constitute the code of Engineering commissioning data and materials
After the completion of the power installation company, the real and intact construction materials shall be submitted. Supervisors often use patrol to intervene in the commissioning process. They should be familiar with the commissioning status and commissioning results, confirm the accuracy of the commissioning materials, sign or request to rearrange the commissioning in time, which constitute strict and meticulous supervision materials, which play an important role in the project delivery, acceptance and later commissioning.